Adjacent to the The Toyota Manufacturing Megasite .. The Toyota Battery Manufacturing Plant is projected to begin production in 2025. The city of Greensboro has an agreement with Toyota Battery to provide water and sewer within a 1 mile radius of the Megasite, but only if developed as industrial. If zoned Residential can be developed with well/septic. .